portfolio_page-template-default,single,single-portfolio_page,postid-450,bridge-core-2.4.1,ajax_fade,page_not_loaded,,vertical_menu_enabled,qode_grid_1300,side_area_uncovered_from_content,qode-child-theme-ver-1.0.0,qode-theme-ver-22.6,qode-theme-bridge,disabled_footer_top,qode_header_in_grid,wpb-js-composer js-comp-ver-6.2.0,vc_responsive,elementor-default,elementor-kit-309

Essex Aluminum Plant Machine Foundations

About This Project

Over the years since the early 1990’s, Oscar Construction has been involved in numerous machine foundations and pits. Most of these projects were completed while the facility remained operational while maintaining noise, vibration and dust control. Photo is of concrete foundations for future aluminum casting turntables at Essex Aluminum Plant.

Date
Category
Industrial