portfolio_page-template-default,single,single-portfolio_page,postid-446,bridge-core-2.4.1,ajax_fade,page_not_loaded,,vertical_menu_enabled,qode_grid_1300,side_area_uncovered_from_content,qode-child-theme-ver-1.0.0,qode-theme-ver-22.6,qode-theme-bridge,disabled_footer_top,qode_header_in_grid,wpb-js-composer js-comp-ver-6.2.0,vc_responsive,elementor-default,elementor-kit-309

George Avenue – Pump Station

About This Project

This east end pump station serves the Windsor community in the delivery of clean water. This included intricate structural concrete which was formed and poured by Oscar Constructions’ own forces after cofferdam sheet piling was installed. This project included all piping, pumps, electrical and controls and the entire building facility.