Leamington Municipal Building - Oscar Construction
464
portfolio_page-template-default,single,single-portfolio_page,postid-464,bridge-core-2.4.1,ajax_fade,page_not_loaded,,vertical_menu_enabled,qode_grid_1300,side_area_uncovered_from_content,qode-child-theme-ver-1.0.0,qode-theme-ver-22.6,qode-theme-bridge,disabled_footer_top,qode_header_in_grid,wpb-js-composer js-comp-ver-6.2.0,vc_responsive,elementor-default,elementor-kit-309

Leamington Municipal Building

About This Project

This municipal building for Leamington has 36,000 SF constructed of structural steel framed structure with high performance wall systems including aluminum composite panels, concrete composite panels, oversized masonry and curtain wall. State of the art 100 seat council chambers with stand alone heating and cooling, custom wood acoustical panels and full audio video capability. Bio-filter living wall tied into the air system to reduce toxins and better indoor quality. Building was designed as a post-disaster emergency facility with reinforced structure and systems. There is a command center with communication tower and 300 kW diesel fired generator.

Date
Category
Institutional
Tags
institutional